📝

SPCB Filing Software

Prepare your California WDO filings without typing each activity into DCA Connect. Bug HQ tracks the 10-business-day deadline and generates the WDO_Log.txt upload file the SPCB WDO Reporting System accepts.

Key capabilities

WDO_Log.txt export
Select the reports you are filing and download the fixed-width WDO_Log.txt file the SPCB WDO Reporting System accepts — one upload instead of typing every activity by hand.
Business-day deadline tracking
Every Branch 3 report is assigned a due date 10 business days after the inspection, per B&P §8516. The Filings page shows what is due soon and overdue.
Activity codes set for you
Each report carries the right SPCB code — 1 Original, 2 Limited, 3 Supplemental, 4 Reinspection — and completion notices file as code 5.
Prepaid account tracking
Record your SPCB WDO account deposits and watch the running balance, so you know you can cover the $5-per-activity fees before you file.
Batches & confirmations
Group reports into a filing batch and store the SPCB submittal/confirmation number against each one for your records.
Open SPCB Connect
A one-click link opens connect.pestboard.ca.gov so you sign in with your own account and upload the file.

How filing works

1

Select reports

On the Filings page, pick the WDO reports and completion notices you are filing. Bug HQ shows each one’s business-day due date.

2

Download WDO_Log.txt

Click Download SPCB upload file. Bug HQ builds the fixed-width file — one line per activity, with the correct activity code and your license and registration numbers.

3

Upload in Connect

In DCA Connect, go to WDO Activity → Manage Activities → Upload File, select WDO_Log.txt, and click Submit Selected. Save the submittal number back in Bug HQ.

What Bug HQ checks before you upload

SPCB filing is unforgiving about two things: the deadline and the file format. California requires each WDO activity to be reported within 10 business days of the inspection (B&P §8516(b)) or of work completion (B&P §8518(b)), and the WDO Reporting System only accepts a fixed-width upload file with every field in the right place. Bug HQ handles both so a bad line or a missed date never reaches DCA Connect.

Deadlines counted conservatively

Each Branch 3 report is given a due date counted forward in business days (Monday–Friday) from the same inspection date printed on the WDO report itself, so the filed date and the report date always agree. Public holidays are not skipped in the count, which means the date Bug HQ shows is never later than the statutory deadline — if anything it is a day or two early. The Filings page lists what is due soon and what is overdue.

Every required field validated first

The WDO Reporting System needs a complete record for each activity: company name, your registration (PR) number, the inspection date, the street number and street name, city, ZIP, inspector license, and the activity code. Bug HQ builds one line per activity in the exact field order and widths the SPCB expects — and if a report is missing a required field (a common one is a property address with no leading street number, or a blank ZIP), it is flagged and held back instead of writing a malformed line you would only discover after the upload is rejected. Notice of Work Completed activities file with the SPCB's LicNotReqd placeholder in the license field, exactly as the Board expects for a completion notice.

Activity codes assigned automatically

Bug HQ reads each report's type and sets the Form 43M-52 activity code for you — 1 Original, 2 Limited, 3 Supplemental, 4 Reinspection — and every Notice of Work Completed files as code 5. One batch can mix inspection reports and completion notices; they all go into the same WDO_Log.txt upload. See the SPCB WDO filing guide for how the whole process fits together, or the WDO report software that produces the reports you file.

FAQ

What is the WDO_Log.txt file?

It is the fixed-width text file the SPCB WDO Reporting System accepts under Upload File, so a company can file many activities at once instead of typing each. Bug HQ generates it from the reports you select.

Does Bug HQ submit to the SPCB automatically?

No — the SPCB does not offer a public filing API. Bug HQ prepares everything: deadlines, the WDO_Log.txt file, batches, and confirmation tracking. You upload the file and click Submit in DCA Connect with your own account.

How does the $5 fee work?

Under 16 CCR §1997 the SPCB charges a $5 fee for each activity filed. You fund a prepaid WDO account in Connect; Bug HQ lets you record deposits and track the balance so you can cover the fees before filing.

Are completion notices included?

Yes. A Notice of Work Completed files as activity code 5 and is included in the same WDO_Log.txt upload. On those lines Bug HQ writes the SPCB’s LicNotReqd placeholder in the license field, as the Board expects for a completion notice.

Which activity codes does Bug HQ set?

Bug HQ reads each report’s type and assigns the Form 43M-52 activity code automatically: 1 Original, 2 Limited, 3 Supplemental, 4 Reinspection, and 5 for a Notice of Work Completed. A single filing batch can mix inspection reports and completion notices in one WDO_Log.txt file.

What if a report is missing an address field?

The WDO_Log.txt line needs a street number, street name, city, ZIP, registration number, and inspector license. If any required field is missing — for example a property address with no leading street number, or a blank ZIP — Bug HQ flags that report and holds it back instead of writing a malformed line, so you fix it before uploading rather than after the SPCB rejects it.

File your WDO activities in one upload

Get Started →